Six Sigma Quality Resources for Software & Information Technology In association withSix Sigma Advantage, Inc. - Six Sigma Third Wave for Software Development
 Main Site > Software / IT Channel > Methodologies  > Six Sigma Search:
 
 for    
Publications
Marketplace
| iSixSigma
Stuff
| iSixSigma
Blogosphere
| Events
Calendar
| The
Dictionary
| Discussion
Forum
| Find
a Job
| Post
a Job
| Industry
News
| Newsletter
Signup
| Sigma
Calculator
| Online
Surveys
DMAIC 2009 Training Slides: 1,220 PPT Slides + Instructor Notes and More for $99.95
iSixSigma Magazine Signup
 iSixSigma Live!  
  2010 Summit & Awards
  2010 Energy Forum
 Free Newsletters!  
  Sign Up Now!
  Manage Subscriptions
  New To Six Sigma?
  Six Sigma Q&A
  Cert. Practice Test
  Problem Solving Wizard
  ISSSP Info
ISSSP Is The Official Six Sigma Society of iSixSigma
 Channels 
  iSixSigma Main
  Europe
  Financial Services
  Healthcare
  Military
 Quality Directory 
  Recent Articles
  Certifications/Awards
  Consultants
  Culture Evolution
  Methodologies
   BPR
   DMAIC
   Kaizen
   Metrics
   Six Sigma
   TQM
   Work-Out
  News & Events
  Organizations
  Product/Service Guides
  Statistics & Analysis
  Tools & Templates
  Voice of the Customer
  Free Whitepapers
 Related Topics 
  Innovation
  Outsourcing/Offshoring
  Business Process Mgt
 Quick Access 
  Help
  Search
  Advertise Here
  Article Archives
  Newsletter Archives
 User Feedback 
  Please suggest site
  improvements.
 
  [ larger form ]

DMAIC Versus DMADV

Bookmark This Page Bookmark This Page
Email This Page Email This Page
Format for Printing Format for Printing
Cite This Article Cite This Article
Submit an Article Submit an Article
Six Sigma Article Archive Read More Articles
Six Sigma Quick Poll
Have you ever started a DMAIC project and learned it needs to be a DMADV project?
Yes
No
Haven't done either
Download Products
By Kerri Simon

We know that everything in business is a process, right? Sales people have a list of companies and contacts that they work in a certain fashion to produce a sale, production receives an order and schedules the manufacturing, the product is built, packaged, shipped and invoiced. When the packing department has a problem with their process, though, should they fix it with a DMAIC or DMADV (also referred to as DFSS) type project?

The Similarities of DMAIC and DMADV
Let's first look at the DMAIC and DMADV methodologies and talk about how they're alike. DMAIC and DMADV are both:

  • Six Sigma methodologies used to drive defects to less than 3.4 per million opportunities.
  • Data intensive solution approaches. Intuition has no place in Six Sigma -- only cold, hard facts.
  • Implemented by Green Belts, Black Belts and Master Black Belts.
  • Ways to help meet the business/financial bottom-line numbers.
  • Implemented with the support of a champion and process owner.

The Differences of DMAIC and DMADV
DMAIC and DMADV sound very similar, don't they? The acronyms even share the first three letters. But that's about where the similarities stop.

DMAICDefine
 Measure
  Analyze
   Improve
    Control
  • Define the project goals and customer (internal and external) deliverables
  • Measure the process to determine current performance
  • Analyze and determine the root cause(s) of the defects
  • Improve the process by eliminating defects
  • Control future process performance

When To Use DMAIC
The DMAIC methodology, instead of the DMADV methodology, should be used when a product or process is in existence at your company but is not meeting customer specification or is not performing adequately.

DMADVDefine
 Measure
  Analyze
   Design
    Verify
  • Define the project goals and customer (internal and external) deliverables
  • Measure and determine customer needs and specifications
  • Analyze the process options to meet the customer needs
  • Design (detailed) the process to meet the customer needs
  • Verify the design performance and ability to meet customer needs

When To Use DMADV
The DMADV methodology, instead of the DMAIC methodology, should be used when:

  • A product or process is not in existence at your company and one needs to be developed
  • The existing product or process exists and has been optimized (using either DMAIC or not) and still doesn't meet the level of customer specification or six sigma level

"I Thought it was a DMAIC, But it Turned Out to be a DMADV!"
Occasionally a project is scoped as a DMAIC for incremental process improvement when it really required a DMADV methodology improvement. And it was a month into the project that you realized this! Don't be discouraged about the work you put into the DMAIC because 1) it's happened to more businesses than just yours, 2) you understand the process at a much greater detail than you did initially, and 3) you were able to practice not just DMAIC skills but also DMADV!

Pick yourself up, dust yourself off and re-craft your define piece of the project so you can begin with a fresh look at the project and solutions. You never know what insights you'll have now that you may not have been aware of before.

 
Rate This Article:  Current Rating: 4.24
  Poor    Excellent     
          1    2    3     4    5
Copyright � 2000-2009 iSixSigma – All Rights Reserved
Reproduction Without Permission Is Strictly Prohibited – Copyright Requests


Publish an Article: Do you have a Six Sigma tip, learning or case study?
Share it with the largest community of Six Sigma professionals, and be recognized by your peers.
It's a great way to promote your expertise and/or build your resume. Read more about submitting an article.



BEST SELLING PRODUCTS (iSixSigma Publications)
  1. Six Sigma Black Belt (DMAIC) Training Slides - 2009 Version!
    The 2009 Six Sigma Black Belt course includes over 40 more slides than the 2008 version. Contents include: 1,220 PowerPo...
  2. Certified Lean Six Sigma Black Belt Assessment Exam
    Interested in assessing your knowledge of Lean Six Sigma? Preparing for certifications? Testing your students and traine...
  3. Certified Lean Six Sigma Green Belt Assessment Exam
    This assessment exam is useful for students interested in assessing their knowledge of Lean Six Sigma on the Green Belt ...
  4. Kaizen Workshop E-book
    This 150+ page ebook teaches key tools and techniques of Kaizen, as well as real application to enhance learning. Kaizen...
  5. Certified Lean Six Sigma Black Belt E-book
    In 670 pages learn everything within the Lean Six Sigma DMAIC body of knowledge to successfully achieve Black Belt certi...
  6. Process Management Training Slides
    The 2008 Process Management course is designed in two phases comprised of:352 Powerpoint slidesInstructor notesSlide exp...
  7. Design For Six Sigma (DFSS) E-Book or Print
    Need an "encyclopedia" consisting of many of the tools you’ll study? Need a helpful refresher to apply the DFSS process?...
 
Six Sigma AdLinks



Google AdWords
 
Home | Discussion Forum | Event Calendar | Job Shop
Link To iSixSigma | Rate This Page | Report A Problem | Free Content For Your Site | Submit Article For Publishing
 Terms of Service. �2000-2009 iSixSigma. All rights reserved. v3.0lb, 0.2
About iSixSigmaContact UsPrivacy PolicySite Map