Six Sigma Quality Resources for Software & Information Technology In association withSix Sigma Advantage, Inc. - Six Sigma Third Wave for Software Development
 Main Site > Software / IT Channel > Best Practices  > eBusiness Search:
 
 for    
Publications
Marketplace
| iSixSigma
Stuff
| iSixSigma
Blogosphere
| Events
Calendar
| The
Dictionary
| Discussion
Forum
| Find
a Job
| Post
a Job
| Industry
News
| Newsletter
Signup
| Sigma
Calculator
| Online
Surveys
2008 Version! DMAIC Training Slides: 1,176 Slides + Instructor Notes and More for $99.99
iSixSigma Magazine Signup
 iSixSigma Live!  
  Summit & Awards
  Most Successful Start-up
  Breakthrough Projects
  Speaker Proposals
 Free Newsletters!  
  Sign Up Now!
  Manage Subscriptions
  New To Six Sigma?
  Six Sigma Q&A
  Cert. Practice Test
  Problem Solving Wizard
  ISSSP Info
ISSSP Is The Official Six Sigma Society of iSixSigma
 Channels 
  iSixSigma Main
  Europe
  Financial Services
  Healthcare
  Military
 Quality Directory 
  Recent Articles
  Certifications/Awards
  Consultants
  Culture Evolution
  Methodologies
  News & Events
  Organizations
  Product/Service Guides
  Statistics & Analysis
  Tools & Templates
  Voice of the Customer
  Free Whitepapers
 Related Topics 
  Innovation
  Outsourcing/Offshoring
  Business Process Mgt
 Quick Access 
  Help
  Search
  Advertise Here
  Article Archives
  Newsletter Archives
 User Feedback 
  Please suggest site
  improvements.
 
  [ larger form ]

Six Sigma Case Study: Converting Paper to Electronic Documents

Bookmark This Page Bookmark This Page
Email This Page Email This Page
Format for Printing Format for Printing
Cite This Article Cite This Article
Submit an Article Submit an Article
Six Sigma Article Archive Read More Articles
By N
New from iSixSigmaJoint Design for Electronics Cooling Heat Exchangers Project Example

FMEA - Data Center Rework

Cost Analysis Requirements Document Project Example
iraj Goyal

This work described below was carried out in a large company based in the US and India. The project dealt with converting printed paper from US customers into electronic copies. The material was quite heterogeneous in nature - consisting of assorted magazines and legal papers. It is part of an ongoing operation that services several customers. The results obtained have wide applicability in the back rooms of industries processing large amounts of data - IT enabled services, banks, insurance companies, hospitals etc. - and computer based office processes.

This project was taken up as a demonstration example within the framework of building a Six Sigma mind-set in the organization, while training a core group in the use of the techniques and the teamwork required. The problem solving methodology consisted of seven steps, combined with quality tools to create a dramatic improvement in the quality of the output far beyond the expectations of anyone in the organization.

The narrative unfolds in the same sequence as the project followed - through each of the seven steps of problem solving accompanied by education in and application of the six sigma techniques relevant to the problem.

1. Selection Of The Problem
1.1) A meeting of the senior management of the company was held and a brainstorming session produced a list of over 30 problems. These were affinitized into two categories:

  • "End result" problems faced by the external customers
  • Internal problems that were causes of customer problems rather than basic problems themselves.

The realization that the first category of problems was the one to be attacked (customer focus) came spontaneously.

Then prioritization was done to select the most important problem using the weighted voting system followed by a quick discussion to produce a consensus. The theme (CTQs) selected was "Consistency of Quality and Timeliness".

1.2) The problem area: Within the theme, intuitively the management recommended a particular customer line. When asked to collect data for different customer lines and present it, to their surprise they found that another major line had a bigger problem. This was the line selected. The realization of the importance of data based had begun!

1.3) Definition of the problem: Data (including errors) was collected for 30 days. During this exercise it was realized that different auditors were classifying the same error in two different ways, leading to measurement system discrepancies. This led to a reclassification of the errors, and training of the auditors.

From the data then collected and analysed the problem was defined as follows:
Customer requirement: <50 ppm errors
Current process average errors: 510 ppm
Variability (sigma): 710 ppm
(Average + 3 sigma): 2640 ppm
Note: Errors were collected before rework to ensure that the root causes would be exposed.

Problem definition: Reduce error density to assure 3-sigma quality under 50 ppm from the current 2640 ppm (i.e. 98%).

2. Finding The Vital Few To Attack
The errors collected were categorized using a Pareto diagram. Prioritization was required at three levels:
Level 1: Four categories, C1 to C4 - one category (C1) constituted 85% of the errors
Level 2: C1 into 4 categories, C11 to C14 - one (C11) category constitutes 98% of the errors
Level 3: C11 into 4 categories, C111 to C114 - one (C111) constituted 85% of the errors
Category C111 was attacked as it constituted approximately 65% of the total problem.

3. Idea Formulation For Countermeasures
Seven error types were found in C111 in two broad categories. They were examined to determine why each one could have occurred, and a brainstorm for possible countermeasures was done. The most likely measures to "Kill the Problems" were selected for trial implementation.

4. Idea Testing And Modification
The selected countermeasures were analyzed and tested for each error type and the successful countermeasure was short-listed for implementation.

5. Implementation Of Countermeasures
Training instructions were prepared for the new procedures and all the operators were trained. Implementation of all the countermeasures was done across the system from a particular date.

6. Confirming The Results
The team was trained in control charts and the X bar-sigma charts were introduced to monitor the results. A dramatic reduction occurred from the day of implementation ,and the first three weeks confirmed that a drop of 90% in error density had been achieved from 2640 ppm to around 300 ppm.

Tremendous enthusiasm was generated in the team as the result of this project far exceeded their expectation.

7. Maintenance Of Improvement - Continuous Small Improvements
Standard operating procedures (SOP) were drawn up for the process changes. A special session with the operating personnel emphasizing regular review, and killing any abnormal peaks that may have occurred in the control chart was explained. An SOP covered the frequency of review meetings for each level of supervision and management and a review format was introduced. The line supervisor who was part of the team became the enthusiastic owner of quality and the control chart, as well as the leader of the team charged with maintaining quality and continuously improving it. The slogan "If you do not improve, you deteriorate" was introduced.

This effort gradually brought down the (average + 3 sigma) error density further from 300 ppm to <50ppm.

The Quality Improvement (QI) Story
A QI Story was prepared for presentation to senior management detailing the improvements that occurred:
Tangible

  • Customer delight: Customer reported 100% quality in his sampling consistently over six months. He could not find errors at such a low density.
  • Productivity and Cost: Inspection and rework reduced to almost zero. 99.7% first pass efficiency. Sampling sizes were reduced. These resulted in savings of US $ 50000 per annum at Indian wage levels (in US equivalent US $ 300,000 per annum).
  • Volume Increase: Approximately 50% by the customer. The production went through without increased manpower.
  • Turnaround of the documents was improved dramatically due to no rework and started meeting customer requirements.

Intangible

  • Senior management time saved
  • Motivation of the operations personnel very high
  • Team work between Operations, Instruction and tool development and QA personnel
  • Mind-set Changes
  • Producing quality saves money
  • The importance of data and six sigma techniques.
  • If you don't improve, you deteriorate

Future plans for improving the turnaround by 50% using just in time methods are being implemented now.

Conclusion, Six Sigma - Techniques and Mind-set
The case here emphasizes the importance of Six Sigma techniques implementation being accompanied by building a culture and mind-set of continuous improvement and change in all employees. In the author's view and experience it is the creation of synergy between people and techniques that ensures maximum and continuing benefits from a Six Sigma/TQM initiative.

About The Author
Niraj Goyal has 25 years of rich and varied working experience in multinationals in various operating roles, among them Operations Director, Cadbury India Limited, where he was exposed to and was among the leading implementers of the TQM movement. A few years back he set up his own consultancy, Cynergy Creators Private Limited. Mr. Goyal consults in India and US with a diversity of industries - training them and facilitating the implementation of the techniques of TQM and Six Sigma until the culture of continuous change is internalized. Further details about this article and assistance for similar change initiation and implementation through training and facilitation can be obtained from Mr. Goyal at nirajgoyal@vsnl.in.

 
Rate This Article:  Current Rating: 3.84
  Poor    Excellent     
          1    2    3     4    5
Copyright © 2000-2008 iSixSigma – All Rights Reserved
Reproduction Without Permission Is Strictly Prohibited – Copyright Requests


Publish an Article: Do you have a Six Sigma tip, learning or case study?
Share it with the largest community of Six Sigma professionals, and be recognized by your peers.
It's a great way to promote your expertise and/or build your resume. Read more about submitting an article.


Download the iSixSigma Toolbar for 1-Click access. Search Your Way. Everyday. Without Delay.
Get 1-Click iSixSigma access. Search Your Way. Everyday. Without Delay.

BEST SELLING PRODUCTS (iSixSigma Publications)
  1. 2008 VERSION! Six Sigma DMAIC Training Slides
    The complete Lean Six Sigma DMAIC course prepares participants to perform the role of a LSS Black Belt; covering what’s ...
  2. NEW VERSION! Process Management Training Slides
    The OSSS Process Management course is designed in two phases comprised of:352 Powerpoint slidesInstructor notesSlide exp...
  3. Certified Lean Six Sigma Black Belt Assessment Exam
    Interested in assessing your knowledge of Lean Six Sigma? Preparing for certifications? Testing your students and traine...
  4. Gage R&R Excel Template
    Gage Repeatability and Reproducibility (R&R) studies measure the amount of measurement variation that is attributabl...
  5. E6 Sigma DMAIC EZ: Black Belt for Service
    E6 Sigma is THE Six Sigma Holy Grail. The first-ever Six Sigma training and implementation software, REAL Six Sigma is a...
  6. NEW VERSION! Six Sigma Black Belt (DMAIC) Training Slides
    The OSSS Six Sigma Black Belt course is comprised of: 1,176 PowerPoint slides, Instructor notes, Slide explanations, 37 ...
  7. FMEA Excel Template
    Need to be more preventative, prioritize risks, or brainstorm possible failures in a process or product? Use the FMEA to...
 

Six Sigma AdLinks
Improve IT Projects With Six Sigma. Villanova University.
iSixSigma Live! Save up to $700
Lean Office, Lean IT/IS. Act Now and Save.



Google AdWords
 
Home | Discussion Forum | Event Calendar | Job Shop
Link To iSixSigma | Rate This Page | Report A Problem | Free Content For Your Site | Submit Article For Publishing
 Terms of Service. ©2000-2008 iSixSigma. All rights reserved. v3.0lb, 8.4-A-244
About iSixSigma · Contact Us · Privacy Policy · Site Map
nogeo