Six Sigma Quality Resources for Software & Information Technology In association withSix Sigma Advantage, Inc. - Six Sigma Third Wave for Software Development
 Main Site > Software / IT Channel > Tools & Templates  > Poka Yoke Search:
 
 for    
Publications
Marketplace
| iSixSigma
Stuff
| iSixSigma
Blogosphere
| Events
Calendar
| The
Dictionary
| Discussion
Forum
| Find
a Job
| Post
a Job
| Industry
News
| Newsletter
Signup
| Sigma
Calculator
| Online
Surveys
2008 Version! DMAIC Training Slides: 1,176 Slides + Instructor Notes and More for $99.95
iSixSigma Magazine Signup
 iSixSigma Live!  
  iSixSigma Live! Summit
  Agenda
  Registration Info
  Breakthrough Awards
 Free Newsletters!  
  Sign Up Now!
  Manage Subscriptions
  New To Six Sigma?
  Six Sigma Q&A
  Cert. Practice Test
  Problem Solving Wizard
  ISSSP Info
ISSSP Is The Official Six Sigma Society of iSixSigma
 Channels 
  iSixSigma Main
  Europe
  Financial Services
  Healthcare
  Military
 Quality Directory 
  Recent Articles
  Certifications/Awards
  Consultants
  Culture Evolution
  Methodologies
  News & Events
  Organizations
  Product/Service Guides
  Statistics & Analysis
  Tools & Templates
   DOE
   FMEA
   Glossary
   Histogram
   Pareto
   Poka Yoke
   SIPOC
   Software
  Voice of the Customer
  Free Whitepapers
 Related Topics 
  Innovation
  Outsourcing/Offshoring
  Business Process Mgt
 Quick Access 
  Help
  Search
  Advertise Here
  Article Archives
  Newsletter Archives
 User Feedback 
  Please suggest site
  improvements.
 
  [ larger form ]

Work Instructions for Mistake Proofing

Bookmark This Page Bookmark This Page
Email This Page Email This Page
Format for Printing Format for Printing
Cite This Article Cite This Article
Submit an Article Submit an Article
Six Sigma Article Archive Read More Articles
Related Tools & Articles
  • B
    Download Products
    y Kiran Walimbe

    1. Use CFT approach to Mistake proofing.

    2. Selection of process for Mistake proofing.
      During the third phase of APQP, the CFT shall identify the processes, where, due to avoidable human errors, the rating of "Occurrence" and/or "Detection" have increased thereby increasing the RPN for the process. Poka Yoke techniques of mistake proofing are applied to these processes in order to lower the ratings of Occurrence and / or detection.

      Analysis of Customer complaints also reveals activities which are in need of mistake proofing, in order to achieve 'Zero Defect' level of working. CFT will undertake application of Poka Yoke techniques to these processes.

    3. The selected mistake proofing technique should qualify the following criteria:
      • Inexpensive.
      • Based upon common sense, preferably of the operator or the 1st line employee.
      • It MUST eliminate Occurrence / Detection of the problem at the source itself.

    4. Occurrence oriented Poka Yoke should follow the procedure as below:
      A) First classify the source of 'Occurrence' as follows:
      1. Required action is NOT performed or is performed incorrectly.
      2. Undesired action is exercised.
      3. Information essential for performing the action is mis-interpreted.
      4. Mistake occurs due to complexity.


      B) After having classified the source, apply one of the following techniques, as appropriate, to prevent the occurrence:
      • Use of 100% prevention devices such as Fouling Pins, Contoured locators or templates, Proximity or Photo-electric sensors, Limit or Micro switches, Warning lights or Buzzers, Pressure transducers.
      • Design to modify to ensure that in assembly the parts shall not join if aligned wrongly.Machine will not run if operators' hands or feet are not outside or if the job & tooling are not in right position.
      • These techniques should be integral part of the process.The devices are placed sufficiently close to where the mistakes occur, providing fast feedback to the operator, of mistakes occurring.

    5. Detection oriented Poka Yoke should use one of the following techniques for ensuring 100% detection of the mistake:
      • It should be autonomous inspection occurring without intervention.
      • It should be 100% inspection which occurs without intervention.
      • It should determine 'before the fact' whether the conditions for 100% quality exist or not.
      • It should make the error visible to the operator.
      • Consider supply of exactly made kits of components to the assembler, so that any balance part will signal error in assembly.
      • Consider use of electronic sensors to activate warning lights or buzzers.
      • Use color coded parts or graphics.
      • Make use of contact devices e.g. Fixtures, Limit switches, probes or Non-contact devices e.g. LEDs, Pressure transducers etc.

    6. Effectiveness of the applied Poka Yoke technique should be judged after observing the performance, for a period on minimum one month.

    About The Author
    Kiran Walimbe graduated in Mechanical Engineering from University of Bombay in 1972, with First class. Mr. Walimbe has 30 years of experience mostly on Production floors of Indian Automotive organizations, and is presently offering Consultancy services in the areas of QS 9000 certifications, Outsourcing & business tie-ups. Mr. Walimbe can be reached via email at kiran@pn3.vsnl.net.in.

     
    Rate This Article:  Current Rating: 3.55
      Poor    Excellent     
              1    2    3     4    5
    Copyright © 2000-2008 iSixSigma – All Rights Reserved
    Reproduction Without Permission Is Strictly Prohibited – Copyright Requests


    Publish an Article: Do you have a Six Sigma tip, learning or case study?
    Share it with the largest community of Six Sigma professionals, and be recognized by your peers.
    It's a great way to promote your expertise and/or build your resume. Read more about submitting an article.

    BEST SELLING PRODUCTS (iSixSigma Publications)
    1. Certified Lean Six Sigma Green Belt Assessment Exam
      This assessment exam is useful for students interested in assessing their knowledge of Lean Six Sigma on the Green Belt ...
    2. Six Sigma Black Belt (DMAIC) Training Slides
      The 2008 Six Sigma Black Belt course is comprised of: 1,176 PowerPoint slides, Instructor notes, Slide explanations, 37 ...
    3. Six Sigma DMAIC Training Slides
      The complete 2008 Lean Six Sigma DMAIC course prepares participants to perform the role of a LSS Black Belt; covering wh...
    4. Process Management Training Slides
      The 2008 Process Management course is designed in two phases comprised of:352 Powerpoint slidesInstructor notesSlide exp...
    5. Six Sigma Green Belt Training Slides
      The 2008 Six Sigma Green Belt course is comprised of: 1047 slidesInstructor notesSlide explanations35 data sets20 suppo...
    6. Certified Lean Six Sigma Black Belt Assessment Exam
      Interested in assessing your knowledge of Lean Six Sigma? Preparing for certifications? Testing your students and traine...
    7. 5S Training Course
      One of the key fundamental tools of process improvement is 5S. 5S is a methodology for organizing and minimizing item...
     
    Six Sigma AdLinks
    Improve IT Projects With Six Sigma. Villanova University.
    iSixSigma Live! Save up to $700
    iSixSigma Job Shop: Find The Key Person
    Lean Office, Lean IT/IS. Act Now and Save.



    Google AdWords
     
    Home | Discussion Forum | Event Calendar | Job Shop
    Link To iSixSigma | Rate This Page | Report A Problem | Free Content For Your Site | Submit Article For Publishing
     Terms of Service. ©2000-2008 iSixSigma. All rights reserved. v3.0lb, 1.7-A-244
    About iSixSigma · Contact Us · Privacy Policy · Site Map
    nogeo