Six Sigma Quality Resources for Software & Information Technology In association withSix Sigma Advantage, Inc. - Six Sigma Third Wave for Software Development
 Main Site > Software / IT Channel > Methodologies  > DMAIC (Existing Product/Service) Search:
 
 for    
Publications
Marketplace
| iSixSigma
Stuff
| iSixSigma
Blogosphere
| Events
Calendar
| The
Dictionary
| Discussion
Forum
| Find
a Job
| Post
a Job
| Industry
News
| Newsletter
Signup
| Sigma
Calculator
| Online
Surveys
2008 Version! DMAIC Training Slides: 1,176 Slides + Instructor Notes and More for $99.95
iSixSigma Magazine Signup
 iSixSigma Live!  
  iSixSigma Live! Summit
  Agenda
  Registration Info
  Breakthrough Awards
 Free Newsletters!  
  Sign Up Now!
  Manage Subscriptions
  New To Six Sigma?
  Six Sigma Q&A
  Cert. Practice Test
  Problem Solving Wizard
  ISSSP Info
ISSSP Is The Official Six Sigma Society of iSixSigma
 Channels 
  iSixSigma Main
  Europe
  Financial Services
  Healthcare
  Military
 Quality Directory 
  Recent Articles
  Certifications/Awards
  Consultants
  Culture Evolution
  Methodologies
   BPR
   DMAIC
   Kaizen
   Metrics
   Six Sigma
   TQM
   Work-Out
  News & Events
  Organizations
  Product/Service Guides
  Statistics & Analysis
  Tools & Templates
  Voice of the Customer
  Free Whitepapers
 Related Topics 
  Innovation
  Outsourcing/Offshoring
  Business Process Mgt
 Quick Access 
  Help
  Search
  Advertise Here
  Article Archives
  Newsletter Archives
 User Feedback 
  Please suggest site
  improvements.
 
  [ larger form ]

A Six Sigma Case Study-Tutorial for IT Call Center
Part 4 of 6 – The Analyze Phase

Bookmark This Page Bookmark This Page
Email This Page Email This Page
Format for Printing Format for Printing
Cite This Article Cite This Article
Submit an Article Submit an Article
Six Sigma Article Archive Read More Articles
Related Tools & Articles
  • Discussion Forum
    "(Is) a DMAIC project...completed as soon as...the implementation plan from the Improve phase (is presented)? ...(Is it) good enough to leave the process maps in paper or sticky notes in the wall next to workstations?"

    Contribute to this Discussion
    <
    Download Products
    TBODY>

    Part 4 of this case study-tutorial on applying Six Sigma in an IT call center is about the Analyze phase of a DMAIC project. The goal of the project is to make the company more competitive and profitable. Each part follows the project team as it works through another stage of the DMAIC methodology.
    The iSixSigma article archives contain Part 1Part 2, Part 3, Part 5 and Part 6.

    By David L. Hallowell

    Having refined the project's key outcome measures, defined performance standards for project Y(s), identified segmentation factors and defined measurement systems, the Six Sigma project team of the IT services business began to focus on the Analyze phase. The DMAIC roadmap called for work in these areas during the Analyze phase:

    A1. Measure Process Capability: Before segmenting the data and "peeling the onion" to look for root causes and drivers, the current performance is compared to standards (established in step M2 of the Measure phase).

    A2. Refine Improvement Goals: If the capability assessment shows a significant departure from expectations, some adjustment to the project goals may need to be considered. Any such changes will, of course, be made cautiously, supported with further data, and under full review with the project Champion and sponsors.

    A3. Identify Significant Data Segments and Patterns: By segmenting the Y data based on the factors (x's) identified during the Measure phase – the team looks for patterns that shed light on what may be causing or driving the observed Y variation.

    A4. Identify Possible x's: Asking why the patterns seen in A3 are as observed highlights some factors as likely drivers.

    A5. Identify and Verify the Critical x's: To sort out the real drivers from the "likely suspects" list built in A4, there is generally a shift from graphical analysis to statistical analysis.

    A6. Refine the Financial Benefit Forecast: Given the "short list" of the real driving x's, the financial model forecasting "how much improvement?" may need to be adjusted.

    A1. Measure Process Capability

    The team first looked at the distribution of each Y data set. For those with symmetrical shapes close enough to a normal distribution (the bell-shaped curve in Figure 1) means-based measures (e.g. mean, sigma, or Cp and Cpk) were used to describe capability. For skewed distributions (the histogram in Figure 1, and any cases where the Anderson-Darling test P-value was below about 0.05) a median-based capability measure was used (e.g. median, quartile, percentile).

     Figure 1: Distribution Check for Support Costs

    While the graphical summary in Figure 1 shows median-based capability to the detail of quartiles (1st Quartile: 25%, Median: 50%, and 3rd Quartile: 75%), the team applied a macro to generate a more detailed percentile view, summarized in the list below.

    75th Percentile = $32.80
    80th Percentile = $33.36
    85th Percentile = $35.42
    90th Percentile = $39.44
    95th Percentile = $42.68
    98th Percentile = $44.73

    The support cost 90th percentile capability is $39.44. Call volume, of course, indicates that this was a very costly gap. The results of these and other capability checks, as done at the outset of the Analyze phase, are summarized and compared to established targets in the table below.

     Measure Capability Target
     Customer Satisfaction (Per Collins Industry Assessment) 90th Percentile = 75% Satisfaction 90th Percentile = 85% Satisfaction
     Support Cost Per Call 90th Percentile = $39 90th Percentile = $32
     Days to Close 90th Percentile = 4 Days 90th Percentile = 3 Days or Less
     Wait Time 90th Percentile = 5.8 Minutes 90th Percentile = 4 Minutes
     Transfers 90th Percentile = 3.1 90th Percentile = 2
     Service Time Mean: 10.5 Minutes
     StDev: 3 Minutes 
     Mean: <= 8 Minutes
     StDev: <= 0.5 Minutes 

    A2. Refine Improvement Goals

    Reviewing the data in the table, the team felt that the project targets were still in line and did not require a change at that time. Had there been a surprise or a show stopper, that would have been the time to flag it and determine the right action.

    A3: Identify Significant Data Segments and Patterns

    While planning for data collection (during the Measure phase), the team had done some hypothetical cause-and-effect analysis to identify potentially important x's. At this step, it prepared to use the data to confirm or reject those earlier hypotheses, and to discover other x's that may have been missed.

    Figure 2 outlines some of the common tools for finding patterns in the data. Since most tools are suited for certain kinds of data, a chart like this can be helpful. Like many teams, during A3 this team favored graphical tools, which give quick views of many "cuts" on the data. The team found multi-vari charts were especially flexible in that regard. Later, when refined distinctions were called for (in step A5), the statistical tools like ANOVA, regression, and Chi-Square were brought into play.

     Figure 2: Some Key Analysis Options

    Numerous cuts of the data were reviewed with the goal of shedding light on root causes and drivers underlying variation in the project Y(s). A few of those are summarized in Figures 3 and 4. Figure 3 shows that Problems and Changes look more expensive to service than other types of calls. Figure 4 reveals an added signature in the pattern – Mondays and Friday stand out as being more costly.

     Figure 3: Multi-Vari for Support Costs by Call Type

     Figure 4: Mutli-Vari for Support Cost by Call Type and Day of the Week


    A4: Identify (Refined/More Detailed List of) Possible x's

    Collecting the findings that came out of A3, the team posed strongest in the form of "why" questions:

    The team reviewed the fishbone diagrams, Y-to-x trees, and cause-and-effect matrices that it had built during the Measure phase. At this step, with the benefit of the data and insight gained during A3, the team was ready to get closer to what was really driving the Y(s). Figures 5, 6 and 7 trace the team's thinking as it moved through this step. Figure 5 highlights questions about the driving influence of staff availability – and why it may vary so widely on Mondays and Fridays. Figure 6 highlights the issue of staffing/call volume as a ratio. The initial data had looked at these factors individually. Figure 7 raises questions about several factors that were not measured initially – but the data may suggest these as realistic lower-level x's that should be studied using a sample of follow-on data.

     Figure 5: Fishbone Diagram

     Figure 6: Y-to-x Tree

     Figure 7: Cause-and-Effect Matrix

    The work represented in the previous figures motivated the next round of analysis, step A5, to check the deeper relationships hypothesized. As is often the case, the team had identified some new data that could be useful. Further, it had uncovered some new ways to "torture" the current data to reveal more root cause insights:

    A5: Identify and Verify the Critical x's

    The team made the computations and comparisons suggested by its cause-and-effect work. During this step, there was a leaning toward the statistical tools, to make the verification of driving x's more fact-based and convincing. Figures 8 and 9 illustrate a few elements in that work. Figure 8 shows that some days can be understaffed (Fridays and Mondays) and others (especially Sundays) can be overstaffed. Figure 9 shows that the influence of callbacks on a call's wait time (graphed during A3) is statistically significant (indicated by the P of less than 0.05 in the Callback row of the ANOVA table).

     Figure 8: Multi-Vari with Computed Ranges Overlaid

     Figure 9: ANOVA Output


    A6: Refine the Financial Benefit Forecast

    In its charter, the team had signed up to reduce support costs per call from the current level (as high as $40) to $32. Given the team's analysis on factors driving support cost, the members still thought this was possible, and left the forecast unchanged.

    The team was pleased to see that the key support cost drivers (the delays and interruptions during call servicing) were the same as those known to drive down customer satisfaction – so a win-win seemed to be possible.

    Part 5 is about the Improve phase of the project.

    About the Author

    David L. Hallowell, a co-founder and managing partner of Six Sigma Advantage, Inc., has more than 20 years experience as an engineer, manager and master black belt. As Digital's representative to Motorola's Six Sigma Research Institute, he worked on the original courseware for Black Belts and the application of Six Sigma to software. Mr. Hallowell has supported Six Sigma deployments worldwide. With a special focus on Design for Six Sigma, he has led development teams in the concept development and design of a number of commercial products. Mr. Hallowell has patents and publications in the area of microelectronics packaging and high speed interconnect. He has authored courses in software DFSS, design of experiments, C++ and computational intelligence tools. He co-authored Six Sigma Advantage's Black Belt, Green Belt and foundation curriculum. Mr. Hallowell can be reached at dhallowell@6siga.com.

     
    Rate This Article: 
      Poor    Excellent     
              1    2    3     4    5
    Copyright © 2000-2008 iSixSigma – All Rights Reserved
    Reproduction Without Permission Is Strictly Prohibited – Copyright Requests


    Publish an Article: Do you have a Six Sigma tip, learning or case study?
    Share it with the largest community of Six Sigma professionals, and be recognized by your peers.
    It's a great way to promote your expertise and/or build your resume. Read more about submitting an article.

    BEST SELLING PRODUCTS (iSixSigma Publications)
    1. Certified Lean Six Sigma Green Belt Assessment Exam
      This assessment exam is useful for students interested in assessing their knowledge of Lean Six Sigma on the Green Belt ...
    2. Six Sigma Black Belt (DMAIC) Training Slides
      The 2008 Six Sigma Black Belt course is comprised of: 1,176 PowerPoint slides, Instructor notes, Slide explanations, 37 ...
    3. Six Sigma DMAIC Training Slides
      The complete 2008 Lean Six Sigma DMAIC course prepares participants to perform the role of a LSS Black Belt; covering wh...
    4. Process Management Training Slides
      The 2008 Process Management course is designed in two phases comprised of:352 Powerpoint slidesInstructor notesSlide exp...
    5. Six Sigma Green Belt Training Slides
      The 2008 Six Sigma Green Belt course is comprised of: 1047 slidesInstructor notesSlide explanations35 data sets20 suppo...
    6. Certified Lean Six Sigma Black Belt Assessment Exam
      Interested in assessing your knowledge of Lean Six Sigma? Preparing for certifications? Testing your students and traine...
    7. 5S Training Course
      One of the key fundamental tools of process improvement is 5S. 5S is a methodology for organizing and minimizing item...
     
    Six Sigma AdLinks
    Improve IT Projects With Six Sigma. Villanova University.
    iSixSigma Live! Save up to $700
    iSixSigma Job Shop: Find The Key Person
    Lean Office, Lean IT/IS. Act Now and Save.



    Google AdWords
     
    Home | Discussion Forum | Event Calendar | Job Shop
    Link To iSixSigma | Rate This Page | Report A Problem | Free Content For Your Site | Submit Article For Publishing
     Terms of Service. ©2000-2008 iSixSigma. All rights reserved. v3.0lb, 3.8-C-246
    About iSixSigma · Contact Us · Privacy Policy · Site Map
    nogeo